Engineering Services (ENG)
From concept to construction – clarity for your project

• Clarification of scope, objectives, level of detail, deadlines, and budget
• Actions and load cases
• Preliminary design
• Structural analysis for approval
• Consideration of deviations during execution
• Documentation (report)
ENG 0900 Residual Load-Bearing Capacity
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Compilation and evaluation of the requirements from standards and codes
• Compilation and evaluation of the requirements from client
• Service Lifetime of the components
• Calculations and proofs
• Evaluation Report
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Clarification of responsibilities
• Coordination of requirements
• Examination of production conditions
• QA/QC checklist and test plan
• QC/QC Manual
ENG 1000 Sound Protection Measures
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Requirements of Sound Protection
• Sound protection properties
• Comparison of requirements and properties – computational verification
• Impact assessment and action plan
• Documentation of the optimization proposal
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Calculation / Evidence of summer heat protection
• Calculation / Evidence of winter heat protection
• Calculation / Evidence of humidity analysis (hygrothermal analysis)
• Calculation / Evidence of Sound Protection
• Support during blower door testing (commissioned by the client)
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Concept (materials, connections, fasteners)
• Variant analysis
• Preliminary design of one variant
• Preliminary dimensioning with position-plan and parts list
• Documentation (report)
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Evaluation of existing documentation
• Sampling plan with location details
• Definition of type and number of samples
• Supervision and evaluation of on-site sampling
• Investigation report
ENG 1300 Assembly Concept
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Clarification of responsibilities
• Coordination of requirements
• Examination of on-site conditions
• QA/QC checklist and test plan
• QC/QC Manual
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Sampling targets strategy
• Holding/collection points
• ITP test plan
• Compliance checklist
• Handover documentation
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Change requirements
• Check feasibility
• Coordination with stakeholders
• Planning of the agreed changes
• Introduction and documentation of the agreed changes
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Evaluation of existing standards
• Standardization rules
• Coordination with stakeholders
• Planning and implementation of the agreed standards
• Inclusion in the standard component catalog
ENG 0300 Analysis of Impacts
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Analysis of the specific impact (bombs, fire, earthquakes, temperature, ice)
• Evaluation of standards and state of the art
• Calculation of impacts and load cases
• Limit value analysis
• Incorporation into structural analysis
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Overview of the fire protection properties of the building products
• Evaluation of the client’s fire protection report
• Preparation of a test plan for fire tests (commissioned by the client)
• Monitoring and evaluation of the fire tests
• Documentation
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Evaluation of relevant standards
• Tolerance derivation for production
• Tolerance derivation for planning
• Tolerance derivation for assembly
• Evaluation and documentation
• Clarification of scope, objectives, level of detail, deadlines, and budget
• Selection of the type of permit
• Selection of the relevant authority, laboratories, and external experts
• Checklist of permit requirements
• Preparation and coordination of application documents
• Documentation as a ready-to-submit package (application by the client)

Does any piece fit into your picture? We fill the gap.
